2019 Hydraulic Transient Analysis for Sanitary Pumping Station and Forcemain | Maple Ridge, BC, Canada

This project is to design a sanitary pumping station (SPS) for the North East Albion area in the City of Maple Ridge, British Columbia. The SPS is located on 112 Avenue east of the bridge crossing with Kanaka Creek.

This report presents and discusses the results of a numerical hydraulic transient analysis that has been completed based on the proposed design. The general objectives of the analysis are to review the pipe selection and to recommend the required surge protection equipment (if any) for the proposed 112 Ave SPS and forcemain.

Figure 1: Hydraulic model of the 112 Ave SPS and forcemain system


Figure 2: Scenario 1 – Power failure at full pump speed, HWL, without surge protection


 


Comments

Popular posts from this blog

2021 Hydraulic Study for Peel Feedermain Emergency Shutdown | Region of Peel, ON, Canada

2022 Water Quality Maintenance Plan | City of Markham, ON, Canada

2020 System Curve and Transient Analysis at Anne Street Pumping Station | City of Barrie, ON, Canada