Posts

Showing posts from February, 2022

2022 Water Quality Maintenance Plan | City of Markham, ON, Canada

Image
This project is to develop a Water Quality Maintenance Plan in the City of Markham for the purposes of ensuring that disinfectant residuals in the watermain system are maintained following its initial construction and commissioning.  This work is largely driven by the implementation of a large diameter (750Ø) trunk watermain along Warden Avenue extending northerly from Major Mackenzie Drive to Street E (see Figure 1 ), and for which there will be a relatively large volume of water with potentially little-to-no turnover until such time that sufficient demand is present in the system and/or connectivity to other parts of the City’s broader system is established. In this project, the residual disinfectant (total chlorine) concentration is determined as the minimum of the last week (7 days) of the 28-day simulation period. If the residual disinfectant concentration is at or below a threshold target (0.75 mg/L for the base case), an iterative process is followed to develop a flushing prog