2021 Transient Analysis for Detailed Design on Goreway Drive Zone 5 Watermains | Region of Peel, ON, Canada

Image
This project is to conduct a hydraulic transient analysis for the proposed 750 mm diameter Zone 5 (Z5) watermain on Goreway Drive between Castlemore Road and Countryside Drive. The proposed 750 mm watermain will serve as a sub-transmission main and will be constructed of concrete pressure pipe (CPP) across a distance of approximately 3 km from Castlemore Road to Countryside Drive. The project also comprises the design of 300 mm and 200 mm diameter Zone 5 local distribution watermains on Goreway Drive with the lengths of approximately 710 m and 670 m, respectively. However, this transient analysis is limited to the proposed 750 mm sub-transmission main from Castlemore Road to Countryside Drive, and the objectives of the analysis is to: 1.         Evaluate the hydraulic transient-based risks for the sub-transmission main; 2.         Provide the maximum, minimum, and recommended design pressures for the sub-transmission main; and 3.         Confirm the requirements for combination a